Reviewed by Product Specialist at thinQit. Updated 19 November 2026.
AI teammates know a requirement is final when its record says so explicitly: an approved status, a named approver and an approval date, all stored in the shared project context they read. Anything without those three markers is treated as a draft or an open question, so the agent asks before building on it.
Agents cannot infer finality from tone or from how recently something was written. A confident chat message and a signed-off decision look identical to a model unless the record separates them. This article explains what that record contains, how to write it, and what an AI teammate does when the status is unclear.
What makes a requirement final?
A final requirement is a single statement that a named person with authority has approved, recorded with the date and the exact approved wording. It is final for a defined scope, such as one page, one data entity or one integration, and it stays final until a recorded change request replaces it.
Finality has a boundary. A final requirement protects its own wording, not the whole topic around it, so related questions that nobody has decided remain open. Three fields carry the meaning: status, owner and date. If any one is missing, an AI teammate has no reliable way to tell approved work from a suggestion.

Which signals do AI teammates actually read?
AI teammates read the status field, the approver, the date and the scope attached to each entry in the project context. They do not read intent. A requirement that reads "we should probably use five pages" carries no status, so it is handled as a proposal, while "approved: the site has five pages, approved by the product owner" is handled as a constraint.
The useful signals fall into a short list:
- Status: draft, proposed, approved or superseded, using the same words everywhere.
- Approver: a named person or role with authority over the outcome, never the agent that will implement it.
- Date: when the approval happened, so a later reader can tell which version applied.
- Scope: the page, entity or workflow the requirement covers.
- Dependencies: links to the tasks and screens that rely on it.
Signals outside the record count for nothing. A thumbs-up in a chat thread or a verbal agreement in a call is not final until someone writes it into the record, because the agent never saw it.
How do you mark a requirement as final?
You mark a requirement as final by writing it as one unambiguous statement, naming the approver, setting the status to approved and linking the work that depends on it. Do this at the moment of approval, not at the end of a phase, so the record never lags behind what the team agreed.
- Write the requirement as one statement that a stranger could not read two ways.
- State the scope in the same sentence, for example the page or entity it applies to.
- Add one sentence of reasoning, so a later reader understands why it was chosen.
- Record the approver and the approval date.
- Set the status to approved, and lock the entry against silent edits where your tooling allows it.
- Link the entry to the tasks, screens and documents that depend on it.
- Tell the team in the project log, so anyone holding a copy refreshes it.
The locking step is described in more detail in How Do You Freeze Approved Decisions in an AI Project Canvas?, and the record of reasons is covered in What Belongs in an AI Project Decision Log.

What does an AI teammate do when status is unclear?
When a requirement has no clear status, an AI teammate should stop, name the entry and ask a human to confirm, instead of choosing a reading and building on it. The same applies when two entries disagree or when a task contradicts an approved one.
This behaviour is the point of the record. An agent that guesses will sometimes guess right, and the wrong guesses surface late as rework. An agent that asks turns a hidden ambiguity into a visible question for the person who owns the answer. For the related case of two instructions that clash, see How Do AI Agents Handle Conflicting Instructions?
Which decisions an agent may settle by itself is a separate question that belongs in the same record, and How Do AI Teammates Know Which Decisions They Can Change? covers how those boundaries are written.
How do requirements stop being final?
A final requirement stops being final only through a written change request that names the entry, the proposed new wording, the reason and the affected dependencies. The approver reviews it, and if accepted the old entry is marked superseded while a new approved entry takes its place.
The old version stays in the history, so the team can always answer what was agreed and when it changed. Nobody edits the original in place. If a requirement changes, the procedure in How Do You Update AI Documentation After a Requirement Changes? shows how to update the surrounding documents so no copy keeps the old wording.

Common mistakes that hide finality
Most failures come from approvals that happen outside the record. Four patterns repeat:
- Chat approvals: a decision agreed in a message thread never reaches the context the agent reads.
- Copied wording: the same requirement pasted into a brief and a task drifts apart when only one copy is edited.
- Self-approval: the implementing agent or developer marks its own instruction as approved.
- Everything locked: when every entry is final, trivial edits need change requests and people stop reviewing them.
The fix is the same each time: one primary record, a status that means one thing, and an approver who owns the outcome.
Frequently asked questions
Can an AI teammate approve a requirement itself?
No. Approval belongs to the person who owns the outcome, such as the product owner or client sponsor. An agent can propose a requirement or flag a gap, but if it also approved its own instructions, the record would no longer show that a human accepted the decision.
What if a requirement has a date but no named approver?
Treat it as unconfirmed. A date shows when something was written, not who accepted it. Without a named approver the AI teammate should ask for confirmation before building on it, and the team should add the approver to the record.
Does a final requirement ever change?
Yes, but only through a recorded change request that the approver accepts. The old entry is marked superseded and a new approved entry replaces it, with the history kept. A chat message or an informal comment never changes a final requirement on its own.